Application for the infill of an underpass, engineering works to recontour land, construction of a pedestrian bridge, improvements to Metrolink platforms, and landscaping at Pyramid Park.
Full
Duke Street, Bury, BL9 0EJ
BL9 0EJFull Proposal
Full planning application for the infill of the existing underpass, engineering works (including remediation works; foundation/piling works; and other associated engineering works) to recontour the land within Pyramid Park to tie into existing levels, the construction of a fully accessible pedestrian bridge structure (including alterations to Metrolink-related infrastructure) across the existing Metrolink line to allow access between Knowsley Place, the Metrolink platform (via lift and stairs) and Pyramid Park; improvements to the existing Metrolink platforms and canopies; construction of a new sloped footpath with stairs within Pyramid Park site from bridge; hard/soft landscaping; and associated drainage and lighting schemes.
Application Timeline
- Application Registered
- 04/04/2025
- Application Validated
- 08/04/2025
- Target Decision Date
- N/A
- Committee Date
- 22/07/2025
- Decision Made
- 22/07/2025
- Decision Issued
- 24/07/2025
Case Officer
Applicant
Transport for Greater Manchester