72264 decided approve Last updated 23/01/2026, 12:07

Consultation from Rochdale Council for the construction and operation of 17 wind turbines, each up to 180 meters high, with associated infrastructure including crane pads, access tracks, substation, and more, at Scout Moor Wind Farm.

Consultation From Neighbouring Authority

Edenfield Road, Rochdale, OL12 7TY

OL12 7TY

Full Proposal

Article 18 consultation from Rochdale Council (ref. 25/00680/FUL):Construction and operation of 17 wind turbines with a maximum height to the tip of the blade of 180 metres (above ordnance datum), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm.

Application Timeline

Application Registered
26/08/2025
Application Validated
26/08/2025
Target Decision Date
N/A
Committee Date
N/A
Decision Made
22/01/2026
Decision Issued
23/01/2026