Consultation from Rochdale Council for the construction and operation of 17 wind turbines, each up to 180 meters high, with associated infrastructure including crane pads, access tracks, substation, and more, at Scout Moor Wind Farm.
Consultation From Neighbouring Authority
Edenfield Road, Rochdale, OL12 7TY
OL12 7TYFull Proposal
Article 18 consultation from Rochdale Council (ref. 25/00680/FUL):Construction and operation of 17 wind turbines with a maximum height to the tip of the blade of 180 metres (above ordnance datum), together with associated ancillary infrastructure comprising crane pads and hardstandings; new access tracks; improvement and widening works to Scout Road; onsite substation; underground electrical infrastructure and cabling; fencing and boundary treatments; external lighting; drainage infrastructure; habitat and moorland restoration works; public right of way works; landscaping; temporary construction compound and staging area; underground electrical grid connection to the Rossendale Bulk Supply Point; and associated engineering works; alongside the retention of and improvements to existing access tracks associated with the existing Scout Moor Wind Farm.
Application Timeline
- Application Registered
- 26/08/2025
- Application Validated
- 26/08/2025
- Target Decision Date
- N/A
- Committee Date
- N/A
- Decision Made
- 22/01/2026
- Decision Issued
- 23/01/2026
Case Officer
Applicant